Skip to content

Categories:

Basement Reno Day4

Day 4:

Today we added water connections for the new bathroom, the framing for the bedroom and some insulation for an outside wall that had been left uninsulated since an oil tank had been removed some time ago.

new frame for the coming bedroom

new water connections

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google Bookmarks

Posted in reno.

0 Responses

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

Some HTML is OK

(required)

(required, but never shared)

or, reply to this post via trackback.